skip to Main Content

PLANT FOR ASSEMBLING “SUBGROUP OF POWER TRAIN COMPONENTS FOR CARS”

Technical Sheet


Sector

Automotive

Product

Subgroup of “Power train” components for cars

Components per model

Sizes

9,6 x 4,5 x 2,25 m

Layout

Asynchronous line driving 35 pallets , “U” shaped, double carpet, motorized, where the workstations are located. The line is managed by a supervisor PC.

Main operations

Picking, orientation, placement and verification of flatness of the bearing on the body
Metering of the thread lock on holes
Picking, positioning and screwing of the bearing on the body
Dispensing of the sealant on the body and presence check of the cord, through vision system
Picking, positioning and tightening of the seal plate on the body
Picking, heating and insertion of the shaft on the body; cooling; feeding and tightening “Nut” on the shaft, geometry and temperature checks
Feeding and screwing “Nut” on the rod of the shaft
Axial play control; marking of the body; check of the marking
Clean-up of the pallet.


Photo Gallery

TELL US ABOUT YOUR PROJECT

You can also call us...
+39 0365 597759
... or write to us
[email protected]
Back To Top